Hello,

I’ve got the problem with assign resources in Planner.

I’ve got a task  with fixed duration. I need to assign multiple resources with different number of units. However, this is impossible and Planner assign the same number of units to the checked resources.

Is there is some way how can I change this number?

Thanks