Re: [Nautilus-list] Re: Two major outstanding issues for 1.0.3
- From: Don Melton <don eazel com>
- To: Dan Mueth <dan eazel com>
- Cc: Darin Adler <darin eazel com>, Nautilus <nautilus-list lists eazel com>, Kenneth Christiansen <kenneth gnu org>, Kjartan Maraas <kmaraas online no>
- Subject: Re: [Nautilus-list] Re: Two major outstanding issues for 1.0.3
- Date: Thu, 19 Apr 2001 15:13:12 -0700
On Thu, Apr 19, 2001 at 01:35:28PM -0500, Dan Mueth wrote:
> On Thu, 19 Apr 2001, Darin Adler wrote:
>
> > Besides all the other work for 1.0.3, we have two major issues outstanding:
> >
> > - rolling changes that were done for 1.0, 1.0.1, and 1.0.2 and are not
> > already in HEAD from the nautilus-1 branch to HEAD
> >
> > - getting translations complete in HEAD
> >
> > I'd like to talk about our plans to get these done soon. I'd like to find a
> > volunteer to make sure all the changes from the branch are on HEAD. I'd like
> > to hear Dan's thoughts about how to get the more-complete translations from
> > nautilus-1 branch into HEAD and how to get translations for the additional
> > messages added since the branch was created.
>
> According to my sources (thanks Kenneth)...
>
> Translators who stopped working on HEAD and have been working on the
> branch should be able to copy their existing po file from the branch onto
> HEAD, run 'xml-i18n-update' to pull new/modified strings into their po
> file, and then just translate the new/modified strings. I plan to test
> this and also get a count on the number of new/modified strings in HEAD
> soon.
>
> I'll email gnome-i18n-list with this info soon. I need to chat with Don
> to get an estimate of our deadline for translations if possible.
If we're going to push the bits for 1.0.3 on Monday, May 7, then the
deadline should be a week before on April 30.
--
Don Melton
Director, Client Engineering
mailto:don eazel com
[
Date Prev][
Date Next] [
Thread Prev][
Thread Next]
[
Thread Index]
[
Date Index]
[
Author Index]