Re: [evolution-patches] Re: A patch for calendar based on trunk
- From: Kidd Wang <kidd wang sun com>
- To: evolution-patches ximian com
- Subject: Re: [evolution-patches] Re: A patch for calendar based on trunk
- Date: Wed, 18 Feb 2004 15:00:04 +0800
I've revised the ChangeLog file and checked it in. Thanks for your review.
Rodrigo Moya wrote:
On Tue, 2004-02-17 at 17:53 +0800, Kidd Wang wrote:
Hi,
This patch is aimed for trunk. We have found the behaviour of copy &
paste is different from that of drag and drop.
Suppose we have a 8:30am-9:00am appointment, for example, we get an
all-day event if we drag it from main canvas
to top canvas. On the other hand, the result will be a 12:00am-12:30am
appointment if we perform a copy & paste on
the same original appointment.
Enclosed is a patch to make the two actions behave the same way
described as follows:
In day view and work week view
from main canvas to top canvas
before copy or drag: short event, after paste or drop:
all-day event
from main canvas to main canvas
before copy or drag: short event, after paste or drop:
short event
from top canvas to top canvas
before copy or drag: all-day event, after paste or
drop: all-day event
before copy or drag: long event, after paste or drop:
long event
from top canvas to main canvas
before copy or drag: all-day event, after paste or drop:
short event
before copy or drag: long event, after paste or drop:
short event
I hope the above pseudo code is clear enough:-)
In week view, month view and list view life is pretty simple since
there's no top canvas in these three views. We just get what
we copy or drag after we perform paste or drop.
codewise it looks ok, although it misses some stuff, it seems, in the
ChangeLog file, does it not?
cheers
_______________________________________________
Evolution-patches mailing list
Evolution-patches lists ximian com
http://lists.ximian.com/mailman/listinfo/evolution-patches
[
Date Prev][
Date Next] [
Thread Prev][
Thread Next]
[
Thread Index]
[
Date Index]
[
Author Index]