[gnome-calendar] (2 commits) Non-fast-forward update to branch wip/mcrha/gcal-event-construct



The branch 'wip/mcrha/gcal-event-construct' was changed in a way that was not a fast-forward update.
NOTE: This may cause problems for people pulling from the branch. For more information,
please see:

 https://wiki.gnome.org/Git/Help/NonFastForward

Commits removed from the branch:

  f236ca4... gcal-event: Make sure the calendar property is set before t
  a51b565... gcal-event: Workaround bug in libical-glib before 3.0.12 ve

Commits added to the branch:

  55f6e13... gcal-event: Make sure the calendar property is set before t
  6bc1a98... gcal-event: Workaround bug in libical-glib before 3.0.12 ve


[Date Prev][Date Next]   [Thread Prev][Thread Next]   [Thread Index] [Date Index] [Author Index]