Re: [evolution-patches] Patch to fix drawing of triangles for multi-day events in calendar



Committed.

On Fri, 2004-07-09 at 13:16 +0200, Rodrigo Moya wrote:
> On Thu, 2004-07-08 at 15:44 -0400, Rodney Dawes wrote:
> > This patch fixes the drawing of the triangles for the left and right
> > sides of multi-day events to match the color of the event's rectangle,
> > and also fixes a tiny alignment bug that was not as visible before with
> > most themes.
> > 
> looks ok to me
> 
> cheers





[Date Prev][Date Next]   [Thread Prev][Thread Next]   [Thread Index] [Date Index] [Author Index]